Seamless Integration with Asset Information Management Systems (AIM )

Unify Engineering Data, Project Execution, and Asset Information in One Connected Ecosystem

Video placeholder: Seamless Integration with Asset Information Management Systems (AIM)
What Does It Do
Design data P-1021 E-3310 Digital Project Information Hub Site 01 Unit 100 P-101A Wrench WORKFLOWS Install P-101A Test P-101A Real-Time Progress Plan Actual 64% Jan Apr Jul Oct

Bridging Engineering Design and Project Execution

Wrench + Asset Information Management solves this by:

  • Integrating design data (AVEVA, Hexagon) with execution workflows (Wrench)
  • Creating a Digital Project Information Hub Integrated with Asset information Model
  • Enabling progress-driven execution based on real engineering maturity
  • Providing controlled, validated, and contextual access to all Engineering and project data

The result: Connected Engineering → Real-Time Progress → Reliable Delivery

Key Capabilities

Key Capabilities

Engineering objects, tag maturity and asset information flow into Wrench tasks, progress and handover.

3D models 2D drawings Documents Unit 100 P-101A Centrifugal pump Linked to task Install P-101A Task · WBS 1.2

Integrated Project Information Hub

  • Consolidates 3D models, 2D drawings, documents, and data
  • Links engineering objects to project tasks
  • Enables contextual navigation of asset information
DESIGN TREE Site 01 Unit 100 P-101A V-2204 WBS import Live XML WBS Task Tag no. 1.1 P-101A 1.2 V-2204 1.3 E-3310

Live Design-to-Execution Integration

  • Import AVEVA, Hexagon design structures into Wrench WBS
  • Link tasks directly using Engineering tag numbers
  • Sync data via live integration or XML exchange
TAG MATURITY WRENCH MILESTONE MC-10 Modelled MC-50 Reviewed MC-90 Issued for construction P-101A progress 75% Updated from MC-90

Automated Progress from Engineering Maturity

  • Tag maturity codes (Hexagon/AVEVA) mapped to Wrench milestones
  • Real-time progress updates when engineering evolves
  • Eliminates manual progress tracking
TASK Install P-101A WBS 1.2 · Unit 100 MODEL URL …/model/P-101A Latest design Rev 04 No duplication

3D Model & Document Visualization

  • Direct access to Asset Information models via stored URLs in Wrench
  • View latest design without duplication
  • Maintain version control while accessing source data
DWG-1102 Routed Review Code 1 TRIGGER Rework Approval ASSET INFORMATION MODEL Revise nozzle N2 Auto-trigger

Integrated Design Collaboration Workflow

  • Documents routed through Wrench workflows
  • Review and comments managed in Asset Information Model
  • Automatic rework/approval triggers based on status codes
Validation report Class: Pump 86% MATURITY Approved Completeness Passed Correctness Passed Consistency Passed Missing: Rated power P-101A

Data Validation & Quality Control

  • Ensures completeness, correctness, and consistency
  • Tracks data maturity and approval status
  • Identifies missing or inconsistent information early
Data set 1 Validated · released Commissioning Data set 2 Validated · released Operations readiness Owner / Operator RECEIVED Data set 1 Data set 2

Progressive Handover Enablement

  • Structured transfer of validated data to owner/operators
  • Supports commissioning, training, and operations readiness
  • Eliminates last-minute data chaos
P-101A Pump Unit 100 P&ID FT-1021 Datasheet Model Design to operations Design Build Commission Operate

Single Source of Truth for Operations

  • Links all asset-related data (P&IDs, instruments, documents, models)
  • Provides lifecycle visibility from design to operations
Benefits

Benefits

What engineering, project and owner teams gain when design data and execution stay connected.

Accelerated Project Execution

Reduce delays caused by missing or inconsistent data

Improved Productivity

Engineers spend less time searching for information

Higher Data Quality & Reliability

Built-in validation ensures accurate and complete data

Seamless Collaboration

Unified workflows across engineering and project teams

Efficient Commissioning & Handover

Progressive handover reduces last-minute risks

Single Source of Truth

One trusted platform for all project and asset information

FAQ

Frequently asked questions.

Quick answers on progress tracking, AVEVA models, data quality and progressive handover.

Still have questions?

Reach out, and our team will guide you.

Talk to our team
How is progress tracked using this integration?

Progress is automatically updated based on engineering tag maturity codes, eliminating manual tracking.

Can we view AVEVA models inside Wrench?

Yes. Wrench stores AIM ( AVEVA NET )URLs, allowing direct access to live 3D models and documents.

Does this replace AVEVA tools?

No. It enhances them by connecting engineering data with project workflows without disrupting existing systems.

How does it improve data quality?

Through built-in validation, completeness checks, and status tracking, ensuring reliable and consistent information.

What is progressive handover?

It is a structured approach where validated data is handed over gradually, ensuring readiness for commissioning and operations.

Is the integration real-time or batch-based?

HASH(0xa00422ed0)

Transform Your Project Delivery with Wrench + Asset Information Management System.

Stop managing disconnected systems. Start delivering predictable, data-driven projects.

Book a Demo Talk to a Specialist

30 minutes • Live walkthrough • No obligation