Ensure Every Site Team Builds from Correct Drawing

Digitize, control, and track Issued for Construction drawings across engineering, EPC, and site teams in real time. QR-code verification, mobile access, centralized version control, and digital change workflows eliminate uncertainty caused by outdated drawings, uncontrolled copies, and delayed approvals.

Video placeholder: IFC Drawing Management
What Does It Do
STR-1104 IFC Sheet 1 Rev C SCAN STR-1104 Latest revision Rev C · IFC Issued 04 Mar Change request CR-0318 Redline Shift nozzle Submit

Only the latest IFC revision reaches site

Delivers a fully integrated IFC Drawing Management System designed for EPC and construction projects where accuracy, traceability, and real-time access to drawings are critical.

The platform ensures that only the latest revision of IFC drawings is used at site, eliminating costly errors caused by outdated or unverified documents. By combining QR code-based verification, mobile access, automated workflows, and digital change request management, the solution creates a seamless connection between site teams and engineering offices.

Site engineers can instantly verify drawings by scanning QR codes, raise change requests with redlined drawings, and track approvals—ensuring complete control over drawing lifecycle and revisions.

Key Capabilities

Key Capabilities

Verification, site access, bulk upload, change workflows and reporting keep every IFC drawing under one controlled lifecycle.

DWG NO. STR-1104 REV C · IFC STR-1104 Scanned · Rev C Latest Outdated Under revision

QR Code-Based Drawing Verification

  • Printed IFC drawings embedded with QR codes
  • Instant validation via mobile app
  • Real-time drawing status visibility (latest, outdated, under revision)
DRAWINGS Zone B GA-1105 Rev D PID-2201 Latest STR-1104 Outdated Drawing updated GA-1105 · Rev D Synced 09:42

Mobile-Enabled Site Access

  • Site engineers access drawing status on mobile
  • Eliminate dependency on paper-based tracking
  • Instant notifications on drawing updates
Bulk upload 24 of 36 files DRAWING METADATA REV STR-1104 Structural Zone B Rev C PID-2201 Piping Unit 2 Rev B GA-1105

Bulk Upload & Metadata Management

  • EPCs upload IFC drawings in bulk
  • Automatic tagging with metadata
  • Version control maintained centrally
CR-0318 From site Redline Sheet 3 Shift nozzle 150 mm APPROVALS Site engineer Design lead Next approver Client rep

Digital Change Request Workflow

  • Raise change requests directly from site
  • Attach redlined drawings and comments
  • Configurable approval workflows based on project rules
REVISIONS STR-1104 Rev A Rev B Rev C Rev D approved AUDIT TRAIL Rev D approved 12 Mar CR-0318 closed 11 Mar Rev C issued 02 Mar Triggered EPC modification workflow

Revision & Change Management

  • Automatic tracking of revisions
  • Approved changes trigger EPC modification workflows
  • Full audit trail of drawing lifecycle
ECR Cost / scope impact Raise Review Committee RDN Minor changes Raise Approve COMMITTEE AR JM SK Approved 3/3

Major & Minor Change Handling

  • Structured workflows for:
    • Engineering Change Requests (ECR) – cost/scope impact
    • Revised Drawing Notes (RDN) – minor changes
  • Multi-level approvals including committee voting
DRAWING REGISTER 142 drawings Latest revision Older versions Under approval Under modification PID-2201 Rev C Latest STR-1104 Rev D Latest GA-1105 Rev B Latest

Real-Time Status Tracking

  • Drawing status visibility:
    • Latest revision
    • Older versions
    • Under approval
    • Under modification
CHANGE REQUESTS This month 12 Open 34 Approved 5 Rejected 18 Submitted TRENDS 8 weeks EXPORT Excel PDF Word

Dashboards & Reporting

  • Change request dashboards (Open, Approved, Rejected, Submitted)
  • Automated report generation (Excel, PDF, Word)
  • Insights into project changes and trends
Benefits

Benefits

What site, engineering and EPC teams gain when every IFC drawing is controlled and verifiable.

Eliminate Costly Errors

Ensure site teams always work with the latest IFC drawings, avoiding rework and delays.

Improve Site Productivity

Quick access to verified drawings reduces time wasted on validation and coordination.

Faster Change Implementation

Digitized workflows accelerate approvals and execution of changes.

Enhanced Collaboration

Seamless coordination between site, engineering, and EPC teams.

Full Compliance & Traceability

Maintain complete audit trails for every drawing revision and approval.

Data-Driven Decisions

Leverage dashboards and reports for better project control.

FAQ

Frequently asked questions.

Quick answers on QR verification, change requests and revision control.

Still have questions?

Reach out, and our team will guide you.

Talk to our team
How does QR code-based drawing verification work?

Each drawing is printed with a QR code. Site engineers scan it using a mobile app to instantly verify whether it is the latest version.

Can site engineers raise change requests directly?

Yes, engineers can raise change requests from site, attach redlined drawings, and submit them through a structured workflow.

How are revisions tracked in the system?

Every revision is automatically tracked with full history, including approvals, modifications, and release status.

Does the system support both major and minor changes?

HASH(0xa00461db0)

Can EPC contractors upload drawings in bulk?

Yes, EPCs can upload IFC drawings and revised versions in bulk along with metadata.

What reports are available?

The system generates automated reports on change requests, drawing status, approvals, and project insights.

Transform Your IFC Drawing Management Today.