Inspection & Test Plan (ITP) Digitization
- Create and manage ITPs digitally
- Link inspections to WBS / BOQ / activities
- Capture inspections on web or mobile
- Upload photos, checklists, and evidence
Delivers a structured, digital Quality Management System (QMS) and gain real-time control over quality across the entire project lifecycle.
It embeds quality controls directly into engineering, construction, progress measurement, and payments. By connecting quality with actual project execution, Wrench SmartProject improves contractor discipline, accelerates inspection cycles, supports right-first-time construction, reduces rework and disputes, and gives management early visibility of quality risks across projects and portfolios.
Quality is directly connected to:
Result: Quality is verified as work progresses, not after completion.
Inspection plans, site inspections, NCRs, payment clearance and quality analytics are managed against the work as it is built.
What quality, project and owner teams gain when quality is verified as the work is done.
NCRs raised from failed inspections are corrected early, before defects turn into rework and delay.
Site teams record inspections instantly, and consultants and clients approve them online.
Every inspection, approval and NCR is kept with its evidence in a full audit trail.
Billing is tied to quality clearance, which keeps contractors accountable for their workmanship.
Whether it’s infrastructure, industrial plants, buildings, or data centers, SmartProject scales with your quality requirements.
Quick answers on digital ITPs, inspections and NCR management.
Yes. ITPs are created and managed digitally, with inspections linked to WBS, BOQ or activities. Inspections are captured on web or mobile, and photos, checklists and evidence are uploaded against them.
Online. Site teams record inspections instantly, and consultants and clients approve them online against clear pass, fail or hold statuses. Every approval is kept with automatic traceability for audits and claims.
NCRs are raised directly from failed inspections, with responsibility and corrective actions assigned to each one. Wrench SmartProject tracks open, closed and overdue NCRs and supports root cause analysis and trend reporting.
Yes. Quality approvals are tied to progress certification, which prevents billing without quality clearance. This keeps contractors accountable for their workmanship and supports right-first-time execution.
The dashboards give project-level and package-level quality views. They show NCR trends and aging analysis, along with inspection status by discipline or contractor.
Yes. Quality Management works with construction progress tracking, contract and payment certification, document and drawing management, and safety and interface management. Connection to a BIM-enabled Digital Twin is optional, so quality moves with execution instead of sitting in a silo.
Paper logs and Excel sheets don’t prevent defects — Digital control does.