Proactive Issue Tracking & Resolution

Enables structured, workflow-driven issue tracking across the entire project lifecycle — from identification to resolution and closure — ensuring zero-loss execution and complete governance control

Video placeholder: Issue Management
What Does It Do
ISS-0142 Raised 08 Mar Crane access blocked at Grid C4 Vortex Business Centre · WBS 3.2.1 Review Action Verification Closure AUDIT TRAIL Time-stamped 10 Mar · 14:20 Sent to Verification Site Engineer 09 Mar · 11:05 Action completed

Every issue tracked from logging to closure

Issue Management provides a centralized, workflow-driven system for identifying, assigning, resolving, verifying, and closing issues across the project lifecycle. Every action is time-stamped and audit-tracked. This ensures complete accountability, faster resolution, stronger governance, and early visibility of issues before they escalate into delays, additional costs, rework, or contractual disputes.

Key Capabilities

How issues are logged, resolved and controlled

From structured logging on site to escalation and links into project controls, every issue follows one governed path.

New issue Auto-captured Project ID VBC-2201 WBS 3.2.1-CIV Discipline Civil Originator details Site Engineer Issue title *

Structured Issue Identification & Logging

  • Issues can be raised through a built-in module with standardized data capture
  • Auto-Captured Project Metadata
    • Project ID
    • WBS
    • Discipline
    • Date
    • Originator details
ISS-0142 TYPE PRIORITY IMPACT Interface Critical Time Technical Commercial Interface Safety

Structured Classification

  • Issues can be categorized by:
    • Issue Type: Technical / Commercial / Quality / Safety / Interface / Planning
    • Priority Level: Low / Medium / High / Critical
    • Impact Category: Cost / Time / Quality / Safety / Scope
    • Responsible party assignment
  • Users can attach:
    • Drawings
    • Photographs
    • Supporting documents
    • References
Issue Register ID OWNER DUE STATUS ISS-0138 QA/QC 12 Mar Open ISS-0141 Planning 04 Mar Overdue ISS-0142 18 Mar 24 open Status

Centralized Digital Issue Register

  • All issues are automatically recorded in a centralized Issue Register
  • This enables:
    • Real-time issue status tracking
    • Clear ownership mapping
    • Due date monitoring
    • Escalation visibility for overdue issues
    • Dashboard-based reporting for management review
Review Action Verification Closure ISS-0142 Critical Site Engineer Routed automatically Escalated ESCALATION Project Manager

Workflow-Driven Resolution & Escalation

  • Each issue follows a predefined workflow for:
    • Review
    • Action
    • Verification
    • Closure
  • Issues are routed to responsible users automatically
  • System notifications ensure no issue is overlooked
  • Configurable escalation for critical issues
  • Automatic alerts for delayed resolution
Root cause analysis Why 1 Why 2 Root cause CORRECTIVE & PREVENTIVE CA PA CA Validate before closure

Root Cause & Corrective Action Tracking

  • Capture root cause analysis
  • Define corrective & preventive actions
  • Validate actions before closure
ISS-0142 Interface Document Management System (DMS) Project schedule & tasks Cost centres

Integrated with Project Controls

  • Issue Management integrates seamlessly with:
    • Document Management System (DMS)
    • Project schedule & tasks
    • Cost centres
  • This ensures:
    • Issues impacting compliance are linked to documents
    • Schedule impacts are traceable
    • Cost implications are visible
    • No siloed risk management
New issue REMARKS Assign Trigger workflow Site image ROUTED QA/QC

Mobile Issue Reporting from Site

  • Issues can be raised and tracked through the mobile application
  • Field teams can:
    • Capture site images
    • Add remarks instantly
    • Assign responsibility
    • Trigger workflow in real time
Benefits

Business Benefits for EPC & Construction Projects

Issue Management delivers measurable value:

Centralized and structured issue tracking

All issues are automatically recorded in a centralized Issue Register

Improved accountability and ownership clarity

Every issue has a responsible party, a due date and a clear owner in the register.

Faster issue resolution through workflow automation

Issues are routed automatically to responsible users and move through review, action, verification and closure.

Reduced project delays and coordination risks

This drastically improves response time and reduces coordination delays.

Enhanced governance and audit readiness

Every activity is time-stamped and audit-tracked, ensuring full compliance and governance control.

Real-time visibility for management decision-making

Project leaders get complete visibility into issue trends, bottlenecks, and risk exposure.

FAQ

Frequently asked questions.

Quick answers on logging, routing and closing project issues.

Still have questions?

Reach out, and our team will guide you.

Talk to our team
What information is captured automatically when an issue is logged?

The project ID, WBS, discipline, date and originator details are captured automatically. Issues are raised through a built-in module with standardized data capture, so every entry starts with consistent project metadata.

How can issues be classified and prioritized?

Issues are categorized by type, priority level and impact category, and assigned a responsible party. Types include technical, commercial, quality, safety, interface and planning, priority runs from low to critical, and impact covers cost, time, quality, safety and scope.

What workflow does an issue follow before it is closed?

Each issue follows a predefined workflow of review, action, verification and closure. Root causes are captured, corrective and preventive actions are defined and then validated before closure, with every action time-stamped and audit-tracked.

How are critical or overdue issues escalated?

Wrench SmartProject applies configurable escalation for critical issues and sends automatic alerts when resolution is delayed. The centralized Issue Register also monitors due dates and gives escalation visibility for overdue issues, so none is overlooked.

Can issues be linked to documents, the schedule and cost centres?

Yes. Issue Management integrates with the Document Management System, the project schedule and tasks, and cost centres. Issues affecting compliance are linked to documents, schedule impacts are traceable and cost implications are visible.

Can site teams raise issues from the mobile app?

Yes. Issues can be raised and tracked through the mobile application. Field teams can capture site images, add remarks instantly, assign responsibility and trigger the workflow in real time.

Take Control of Project Risks Today.

Don't let small issues become major delays.

Book a Demo Talk to a Specialist

30 minutes • Live walkthrough • No obligation