Digital Snag & Punch List Management
- Raise snags directly from site (web & mobile)
- Attach photos, comments, and location details
- Assign responsibility and target dates
- Track open, closed, and overdue snags
Delivers a structured, digital snagging, project close-out solution and achieve faster, cleaner, dispute-free project handover.
Wrench SmartProject Snagging and Project Closure provides a structured digital process for identifying, resolving, verifying, and closing every outstanding item. By connecting snagging with quality, progress, contracts, payments, and documents, Wrench ensures nothing is missed or prematurely approved. It enables faster closure, smoother client acceptance, fewer disputes, and a controlled transition from construction to operations.
Snags are directly linked to:
Result: Nothing is missed, nothing is duplicated, and nothing is left unresolved.
Snags are raised, tracked and closed against the work, inspections and payments they affect.
What contractors, owners and facility teams gain when closure is planned and tracked.
Snags are raised from site with photos and location details, assigned an owner and target date, and tracked to closure.
Live closure dashboards and automatic reminders keep open snags visible well before handover.
Snag closure is linked to payment milestones, so final billing follows verified completion.
As-built drawings and final documents are collected into centralized handover dossiers.
Owners and FM teams get complete, easy-to-access handover information at acceptance.
Quick answers on raising snags on site, closure tracking and handover.
Yes. Snags can be raised directly from site on web and mobile, with photos, comments and location details attached. Each snag is assigned responsibility and a target date, then tracked as open, closed or overdue.
Snags can be generated from failed inspections, and open snags prevent progress certification. This link between snagging, quality and progress helps ensure work is completed right the first time before it is certified.
Yes. Retention and final payment control links snag closure to payment milestones, which prevents premature final billing. Payment release is transparent and based on closure, so final billing follows verified completion.
Handover dossiers centralize the as-built drawings and final documents captured during close-out. Structured close-out checklists guide the process, and owners and FM teams get easy access to the handover information.
Through live dashboards. Wrench SmartProject shows closure status with contractor-wise and location-wise views, and automatic reminders and escalation keep open snags visible well before handover.
Snagging and Closure works with quality management and NCRs, construction progress tracking, contract and payment certification, and document and drawing management. It can also connect to a BIM-enabled Digital Twin as an option.
Manual snag lists create delays, disputes, and frustration. Digital closure creates certainty.