Built for Owners & Executives

See what is drifting. Know what matters. Act before delay.

Turn live capital-project signals into prioritized, contextual actions—so owners, EPC teams, PMCs, and project leaders can intervene before emerging risk becomes schedule impact.

Video placeholder: AI Digital Control Tower
What Does It Do
Control Tower Live SIGNALS 128 Exceptions 3 1 Monitor 2 Interpret 3 Prioritize 4 Recommend 5 Act & track

A continuous loop for predictive project governance.

Wrench AI Control Tower sits above live project information, helping leaders move from monitoring to informed intervention without separating recommendations from their context.

  • Monitor: Continuously observe relevant project data and cross-functional conditions.
  • Interpret: Assess patterns, dependencies, schedule context, and emerging exceptions.
  • Prioritize: Rank attention by materiality, urgency, functional area, and potential impact.
  • Recommend: Present contextual next steps and recovery options for expert evaluation.
  • Act & track: Assign ownership, connect due dates, communicate, and follow action to closure.
Key Capabilities

Move from broad visibility to the few actions that matter.

The Control Tower organizes project intelligence by exception, helping teams investigate performance, expose emerging risk, and convert insight into accountable response.

ACTIONS High 4 Medium 7 HIGH PRIORITY ACT-031 Chase SCM vendor for missing interface data LANE Engineering OWNER DUE 18 Sep +6 d VIEW CONTEXT EMAIL OWNER

Action Center

  • Consolidate prioritized actions with functional lane, owner, due date, impact context, and recommended next steps.
  • High- and medium-priority segmentation
  • Engineering, procurement, construction, and other lanes
  • Owner, due date, delay, and schedule context
  • Recommended action with direct View and Email options
SCHEDULE Rev. 12 Logic links Progress dates Calendars Open ends 3 Last scan · 14 Sep 98% DATA HEALTH

Schedule & data health

  • Surface the quality and condition of the information that supports trustworthy project-control decisions.
CRITICAL PATH Float ≤ 5 d W1 W2 W3 W4 W5 A-110 A-120 A-135 A-140 A-150 3 d float MS-4 Critical Near-critical Milestone

Critical path & schedule

  • Focus attention on critical and near-critical conditions that can influence milestone performance.
Pour slab · Level 3 A-2140 · starts 16 Sep Prerequisite ready Install MEP risers A-2155 · starts 17 Sep Blocked – 2 gaps GAPS IFC drawing rev. C Scaffold permit

Task readiness & delays

  • Expose missing prerequisites, blocked work, and readiness gaps before they constrain execution.
PERFORMANCE TREND SPI · weekly 1.05 1.00 0.95 W28 W30 W32 W34 W36 Declining · 4 wks WATCH

Trends & predictive warnings

  • Interpret changing performance patterns and highlight conditions that warrant earlier investigation.
CONTEXT MS-4 Handover Forecast +12 d Recovery options Sample Resequence work front REVIEW Add night shift APPROVE Decision stays with project lead

Recovery recommendations

  • Bring contextual response options forward for professional review, approval, and coordinated action.
PRIORITY LIST Today 1 CON 17 Sep 3 ENG 19 Sep 4 PRO 22 Sep 2 Open safety exception Scaffold tie-off · Zone B HSE 16 Sep

Safety intelligence

  • Keep safety-related exceptions visible alongside the wider project priorities that compete for attention.
ITP-07 Inspection Save result QUALITY SIGNALS 2 new Weld inspection WLD-0412 · Line 3 PASS Coating rework Zone C · 2 areas FLAG MAY AFFECT Readiness Rework Handover

Quality intelligence

  • Identify quality signals that may influence readiness, rework, handover, or project performance.
ENG PRO CON 12 open ACTION OWNER DUE Expedite valve PO 18 Sep Vendor data overdue 20 Sep 24 Sep 27 Sep

Cross-functional view

  • Navigate engineering, procurement, construction, and other workstreams from a common action framework.
Benefits

One intelligence layer. Different decisions.

Each stakeholder sees the same governed project reality through the lens of the decisions, interventions, and commitments they own.

See the exceptions that deserve leadership attention

Move beyond static portfolio reporting to a concise view of emerging risk, priority, accountability, and recovery readiness.

Turn cross-functional signals into coordinated intervention

Bring schedule, engineering, procurement, construction, safety, and quality priorities into one action-oriented governance view.

Investigate schedule conditions before impact compounds

Connect data health, critical-path behavior, task readiness, performance trends, and recovery options to practical control actions.

Know what your team needs to resolve next

Filter the Action Center by functional lane and work with clear priorities, due dates, impact context, and recommended next steps.

Built on live PMIS data

Use current project information as the foundation for continuous monitoring and early-warning intelligence.

Context stays attached

Keep priority, functional lane, schedule reference, delay, owner, and recommended action connected.

Cross-functional traceability

Create a common action view across disciplines while preserving accountable ownership.

Human decision authority

AI supports interpretation and recommendations; responsible professionals review, decide, and act.

FAQ

Frequently asked questions.

Quick answers on what the Control Tower monitors and who decides.

Still have questions?

Reach out, and our team will guide you.

Talk to our team
Is the Control Tower another dashboard?

It is positioned as an intelligence and action layer: continuously monitoring project information, surfacing exceptions, prioritizing attention, and presenting contextual recommendations—not merely displaying more charts.

What areas can it monitor?

The teaser demonstrates an Action Center plus schedule and data health, critical path and schedule, task readiness and delays, performance trends, predictive warnings, recovery recommendations, safety, and quality.

Does it replace the existing PMIS?

No. Wrench describes the Control Tower as built on live SmartProject PMIS data and designed to amplify the existing control environment rather than replace it.

Does AI execute project decisions automatically?

The demonstrated workflow presents insight, priority, context, and recommended actions. Accountable project professionals retain decision and execution authority.

Can it support multiple projects?

Wrench positions the Control Tower as a scalable framework for project and portfolio oversight, subject to the organization’s configured data, governance, and deployment scope.

Which roles is the Control Tower built for?

It is built for owners and executives, project directors and PMCs, and planning and controls teams, as well as EPC teams and project leaders. Each stakeholder sees the same governed project reality through the lens of the decisions and interventions they own, from leadership exceptions to schedule investigation.

What could your team act on sooner?

Bring one project, its current control environment, and the risks consuming the most leadership attention. See how Wrench AI Control Tower can turn live signals into prioritized, contextual action.

Book a Demo Talk to a Specialist

30 minutes • Live walkthrough • No obligation