Master Schedule Integration
- Import and manage Primavera (P6) or equivalent schedules
- Maintain baseline, revised, and recovery schedules
- Version control with full audit trail
Gain real-time visibility into what is planned, what is happening, and what is going to slip.
It transforms project schedules into live, execution-driven plans. It integrates with Primavera P6 or equivalent scheduling tools and connects planned activities with actual progress across engineering, procurement, and construction.
Schedules are directly connected to:
Result: Your schedule reflects reality, not assumptions.
Bring the master schedule in, update it from site, look ahead, and see what each slippage means for cost, resources and risk.
What owners, delivery teams and controls teams gain when the schedule is driven by real execution.
Identify slippages before they hit critical milestones
Progress flows in from site teams, so the schedule stays current without manual consolidation.
Site teams and management work from the same execution-linked schedule.
It answers management questions, not just planner workflows.
Critical path impacts show up early, while there is still time to take corrective action.
Quick answers on execution-driven scheduling with Primavera P6.
Yes. Wrench SmartProject integrates with Primavera P6 or equivalent scheduling tools, so you can import and manage those schedules in the platform. It then connects planned activities to actual progress across engineering, procurement and construction, so the schedule reflects reality rather than assumptions.
Site teams capture actual progress directly, and the platform updates the schedule automatically based on real execution. Daily progress updates from site flow into the linked activities, work packages and locations, which removes the need for manual progress consolidation.
Yes. Wrench SmartProject maintains baseline, revised and recovery schedules alongside your imported Primavera (P6) or equivalent schedule. Every version sits under version control with a full audit trail, so you can see how the plan has changed over time.
Look-ahead planning turns the master schedule into rolling short-interval plans for the work coming up next. The platform generates these look-aheads, tracks constraints, dependencies and readiness, and helps you identify slippages before they hit critical milestones.
Yes. Schedule variance and delay analysis compares planned vs actual progress and lets you visualize delays by package, contractor or location. It also identifies critical path impacts early, while there is still time to take corrective action.
Because the schedule is linked to cost, resources and risk, the platform shows the cost and cashflow impact of any slippage. It links delays to manpower, equipment and procurement, and identifies the risks triggered by schedule deviations.
Primavera shows what should happen. SmartProject shows what is happening — and what will happen next.